這篇文章圖文並茂介紹了蒸汽冷凝水的排放點
https://www.tlv.com/global/TI/steam-theory/steam-lines-best-practices.html
--------------------------------------
Every 30 to 50 meters (100 to 160 feet)

Traps should be installed at 30 to 50 meter (100 to 160 feet) intervals on a steam line.
In Front of Pressure Reducing Valves and Control Valves
A steam trap should be installed immediately before pressure reducing valves / control valves to prevent condensate from pooling when the valve is closed. The trap also helps reduce erosion of the valve seat from condensate. Similarly, traps are also generally installed between two pressure reducing valves in a series installation to remove condensate trapped between the valves during operation or shut-off.
In Front of Manual Valves Closed for a Long Time
A steam trap should be installed in front of valves closed for long periods of time to help eliminate the pooling of condensate which could otherwise be propelled at high speed down the pipeline when the manual valve is opened. Similarly, a steam trap is needed at the end of a pipe run (end of main) to help drain the system for safe and effective operation.
At the Bottom of Vertical Lifts or Drops